Arkansas is one of the few states that enforces a single residential code statewide, the 2021 Arkansas Fire Prevention Code (based on the 2021 International Residential Code), effective since January 1, 2023, applies whether you're inside Jonesboro city limits or out in unincorporated Craighead County. That's a real advantage: the underlying construction standard doesn't change from one town to the next. What does change by address is who administers the permit, what triggers one, and what fee applies. Here's the real breakdown, sourced directly from each jurisdiction, not a generic statewide answer.

City of Jonesboro

The City of Jonesboro's own published FAQ specifically names a "deck with roof" as requiring a permit. We could not confirm from the city's published pages whether an uncovered deck of any size is exempt, don't assume either way. Contact the Planning and Zoning Department directly at (870) 932-0406 to confirm requirements for your specific project before finalizing a design.


Unincorporated Craighead County (Bowman, Antioch)

Bowman and Antioch are both unincorporated communities, not their own cities, so permitting for these addresses runs through Craighead County government rather than a city hall. The County Judge's office (511 Union, Suite 119, Jonesboro) handles plat and subdivision matters for the unincorporated county. Contact Craighead County directly to confirm the current process for a residential deck at your specific address.


Towns with their own city government (Brookland, Cash, Lake City, Bono)

These four are incorporated cities inside Craighead County, each running its own municipal government rather than deferring to the county:

Confirm current deck-specific fee and process directly with each city, none of these publish a fee schedule specific enough to cite a number here without risking it being stale by the time you call.


Egypt

Egypt has been an incorporated town since 1984, a small one, with a 2020 census population of 113. We could not independently confirm a dedicated permitting contact for Egypt's town government. If your project is in Egypt, contact the town directly or Craighead County to confirm the correct process rather than assume it mirrors a neighboring city.


Two towns we serve are not in Craighead County at all

This is easy to get wrong if you assume our whole service area shares one county, it doesn't.

Both fall under the same statewide 2021 IRC-based code, the administering office is just a different county government or city department than a Jonesboro or Craighead County address.


What a permit application typically needs

For what a permit-driven project actually costs beyond the fee itself, see our cost guide, and our new deck construction page for how footing and guardrail requirements translate into the actual build.


FAQ

What happens if I build a deck without a permit?

At minimum, a stop-work order and having to open up finished work for inspection after the fact. It can also become a real problem at resale, an unpermitted structure is something a home inspector or buyer's agent will flag.

Does the same code apply everywhere in our service area?

The underlying construction code, yes, Arkansas's 2021 IRC-based state code applies statewide regardless of city or county. Who reviews your application, what triggers a permit, and what fee applies still depends on your specific address.

Do you handle the permit process for me?

Yes. A builder who confirms the correct jurisdiction for your address, pulls the permit, and schedules inspections as part of the job is standard practice, worth confirming before you sign anything.


Get a Free Quote

Get a Free Quote